Bowns.net
  • Home
  • Mail
  • DJ Mail
  • Kids
  • Links
  • Contact us

Backyard Lawn Project

We are putting in a backyard lawn.
​We already dug the trench and will install the pipe work with sprinkler heads.
We need someone to:
  • Level the yard.
  • Install a brick perimeter.
  • Bring in top soil. Probably a truck load.
  • Level top soil 1/2" below walkway.
From there will order the SOD and install the lawn.
We live in Rocklin, CA.

Lawn Area
(Click for larger picture)

Picture
Picture
Picture

Brick Perimeter ​
​On left (24') and back wall (33')
Sample picture from internet

Picture

Dimensions
Picture
Powered by Create your own unique website with customizable templates.